Search
Monday, December 11, 2023
The Daily
Search
News
Multimedia
Sports
Opinion
In-Depth
Subscribe
Lifestyles
Housing Guide
Classifieds
Send a Tip
°
Full Forecast
The Daily News
  • News
  • Lifestyles
  • Opinion
  • Sports
  • Multimedia
  • In-Depth
  • Housing Guide
  • Classifieds
  • Send a Tip
  • Donate
  • News
  • Lifestyles
  • Opinion
  • Sports
  • Multimedia
  • In-Depth
  • Housing Guide
  • Classifieds
  • Send a Tip
Search

Subscribe

Subscribe to The Daily News

University Dining Changes 10/6/2023, 10:00am

Chick-fil-A to relocate from Atrium to North Dining

By Olivia Ground and Daniel Kehn
 Chick-fil-A to relocate from Atrium to North Dining
Students stand in line for Chick-fil-A and check out lines Oct. 2 in the Atrium. The Chick-fil-A will be leaving the Atrium and moving to North Dining winter 2024. Olivia Ground, DN

Share

  • Share
  • Tweet
  • Mail
  • Print

For some Ball State students, the Atrium’s Chick-fil-A quickly becomes a routine of on-campus living.

“I go to Chick-fil-A literally every day,” first-year communications major Avah Miner said. 

Despite being tucked into the Atrium, the line of chicken-craving students is usually visible when students enter the Arts and Journalism Building. 

“I timed it once, I’ve waited in line for like 45 minutes,” Gisele Westfall, first-year elementary education major, said. 

However, the location of the popular chain will be moving to North Dining in the near future, according to Ball State University Dining. The move has been tentatively slated for January 2024 and will include an upgrade to the existing location. 

“The new Chick-fil-A will not be an express location as it is in the Atrium, we will have [an] expanded menu option,” Karen Adkins, senior director of auxiliaries for university dining and catering, said via email. “At this time, we are still putting together the menu.”

Adkins said customers will be able to enter and place their orders from the east side of the North Dining Building (off McKinley Avenue). The area will take up what used to be the grilled food option and will be separate from the North Dining micro-restaurants, meaning students will be able to access the location in the same way they do with Starbucks. 

The project is being completed by Pridemark Construction and is currently estimated to cost $898,800 according to bid documents.

Construction plans include approximately 1,700 square feet of interior renovation within the first floor of the existing North Dining Facility. The changes include new interior finishes, wall layout and mechanical/electrical systems, according to documents from Purchasing Services.

Westfall lives in North West Hall and said she is personally excited about the move because it will put the location closer to her. However, for Miner who lives in Woodworth Complex, she said it’s a farther walk than she will likely still make. 

“I don’t know how I’ll feel about it in the rain and snow; I’ll have to order from one of those robot things,” Miner said. 

The Starship Delivery Robots were rolled out last year and allow students to get food delivered to their location from around campus.

Adkins included that the new location will require hiring new staff, as the North Dining location will be much larger.

The Daily News reached out to both Karen Adkins, senior director of auxiliaries for university dining and catering, and Andrew Walker, university content and media strategy manager, about the plans for the Atrium post-relocation. Both referenced an upcoming press release that would come out in October. Walker said there was “nothing else to share,” over email. 

While the new location is still under construction, Adkins said university dining and catering is “not quite ready to put that information out” and students can expect more details of the new location and the plans for the Atrium in October.

Contact Daniel Kehn with comments at daniel.kehn@bsu.edu or on X @daniel_kehn and contact Olivia Ground at olivia.ground@bsu.edu or on X @liv_ground_25.

Share



Related Stories

Fourth-year journalism major Emma Plank holds up photos of her as a baby Dec. 1 at the photojournalism studio in the Art and Journalism Building. Mya Cataline, DN

What I’ll take with me

By Emma Plank

Junior Marie Kiefer jumps to shoot the ball againsts Northern Iowa Nov. 18 at Worthen Arena. Mya Cataline, DN

Ball State women’s basketball brings defensive effort to defeat Western Kentucky

By Elijah Poe

Wapahani sophomore Camden Bell tries to blacok a shot Nov. 21 against Muncie Central at the Muncie Central Fieldhouse. Zach Carter, DN.

Delaware County results from 12/4-12/9

By Staff Reports


The Daily News welcomes thoughtful discussion on all of our stories, but please keep comments civil and on-topic. Read our full guidelines here.



Most Popular


11/16/2023, 10:00am

This can’t be the new normal

By Editorial Board

High School Boys' Basketball 11/22/2023, 10:50am

Wapahani defeats Muncie Central in season opener


Men's Basketball 12/2/2023, 6:03pm

'Today was an extremely hard day:' Ball State mens' basketball defeats Bellarmine for Cardinals' seventh win of the season


Cheap Dates 11/11/2023, 10:00am

5 low-cost dates in Muncie





Tweets by bsudailynews
To Homepage
  • About
  • Guidelines
  • Contact
  • Advertise
  • The Daily

All Rights Reserved

© Copyright 2023 The Daily News

Powered by Solutions by The State News.